The replacement of the old timber bridge over the Albert River was an important project that has greatly improved the lives of locals. Bampak was subcontracted by Shamrock Civil to the value of $300,000 to construct a new two-lane reinforced concrete bridge that would reduce the impact of floods. Our team supplied plant, equipment, WH&S, labour and materials to safely carry out the construction.
To enquire about this construction, or to discuss an upcoming project call 0428 199 943. Our capabilities include the design and construction of drainage structures, water reservoirs and weirs. We service SE QLD, including Brisbane, the Sunshine Coast, the Gold Coast, Darling Downs and Caboolture.